Fall 2024 · Shchuchinsk, Akmola Region · Kazakhstan
Pathway to Accessibility
Raised $1,200 to build an accessibility ramp so children with mobility challenges and strollers can get around the grounds safely.
- Raised
- $1,200
- What it paid for
- An accessibility ramp over the heating pipe.

The Pathway to Accessibility project raised $1,200 to fund the construction of an accessibility ramp, making it easier for disabled children and strollers to navigate the grounds.
The ramp was installed over a heating pipe, ensuring safe and easy access for those with mobility challenges.

A thank-you message from the children and staff at the orphanage